EIA process in Turkey, a practical guide for foreign investors
How the Turkish EIA (ÇED) fits into a foreign investor's project schedule, what changed in 2025 and 2026, realistic timelines and the mistakes that cost the most time.
Read articleEnvironmental consulting from Turkey for international companies. CBAM, KKDIK, carbon footprint, EPD, ESG reporting, EIA and permits.
Practical guides to CBAM, KKDIK, ESG reporting, carbon footprints, EPDs and environmental rules in Turkey, written by the engineers who do the work.
How the Turkish EIA (ÇED) fits into a foreign investor's project schedule, what changed in 2025 and 2026, realistic timelines and the mistakes that cost the most time.
Read articleKKDIK copies the structure of EU REACH but not its procedures. A side-by-side comparison, and a practical answer on whether your EU REACH data can be reused for Turkey.
Read articleA point by point comparison of ISO 14067 and the GHG Protocol Product Standard covering boundaries, allocation, recycling, assurance and reporting, and where PACT fits.
Read articleTurkey requires safety data sheets in Turkish, written to KKDIK Annex 2 by a certified KDU and uploaded to the Ministry. When an SDS is needed, what it must contain, and common errors.
Read articleA step-by-step guide to calculating CBAM embedded emissions under the 2026 rules, from installation boundaries to precursors, with an illustrative cement example.
Read articleCBAM explained in plain terms. Covered goods, who must comply, the 50 tonne threshold, certificate prices, default values and what non-EU suppliers need to prepare.
Read articleHow the GHG Protocol's Scopes 1, 2 and 3 line up with the six ISO 14064-1 categories, with a full mapping table, a worked example and tips for reporting one inventory both ways.
Read articleHow GRI, ESRS, ISSB and TSRS, CDP and VSME differ in audience, materiality, legal status and data, and how to pick one or combine them without collecting the same data twice.
Read articleWhat changed when the CBAM definitive period began in 2026. The 50 tonne threshold, new deadlines, certificate sales, verification, default value mark-ups and pending proposals.
Read articleStart a project
Share the regulation, product or site and your deadline. An engineer replies within one working day with what applies and the next steps.
Cookie preferences
We use necessary cookies to run this site. With your permission we also use analytics cookies to understand how the site is used.