EN 15804+A2 EPDs for Construction Products Made in Turkey

EN 15804+A2 EPDs for cement, steel, ceramics, insulation, glass and aluminium products made in Turkey, prepared for EU tenders, whole-building LCAs, LEED and BREEAM projects.

What this covers

  • EPDs to EN 15804+A2 with the right c-PCR for your product
  • Mandatory modules A1-A3, C1-C4 and D, plus A4-A5 and B options
  • Export transport and end-of-life scenarios for EU markets
  • Cement, steel, ceramics, glass, insulation and aluminium
  • Data collected once for the EPD and CBAM reporting
  • Verification and publication with your programme operator
On this page
  1. Why EU buyers ask for EN 15804+A2 EPDs
  2. What EN 15804+A2 requires
  3. Product groups and the c-PCRs that apply
  4. Sector points we check in Turkish plants
  5. Scenarios for EU construction projects
  6. EN 15804 EPDs, CBAM and the CPR
  7. How a construction product EPD project runs
  8. Covering a product range in one EPD
  9. What you receive

We prepare EN 15804+A2 environmental product declarations for construction products made in Turkey and sold into EU projects, including cement, steel, ceramics, insulation, glass and aluminium profiles. The work covers the LCA, plant data collection, the EPD itself and coordination with the independent verifier and programme operator, so your product can be specified in tenders, whole-building LCAs and LEED or BREEAM projects.

Why EU buyers ask for EN 15804+A2 EPDs

EN 15804 is the European core product category rule for construction products. Since amendment A2 (2019), it is aligned with the EU Environmental Footprint method, and EPDs to the earlier A1 version are being phased out by programme operators and building LCA tools. A buyer in the EU who asks for "an EPD" for a construction product nearly always means an EN 15804+A2 EPD.

Demand comes from several directions at once.

  • Whole-building LCA under EN 15978, which the recast EPBD (EU) 2024/1275 makes mandatory for disclosure of life-cycle GWP for new buildings over 1,000 m² from 1 January 2028 and for all new buildings from 1 January 2030.
  • LEED, where the Building Product Disclosure and Optimization credit in v4 and v4.1 counts products with Type III EPDs, and product-specific verified EPDs carry more weight than industry-average ones. LEED v5 merges the material credits and continues to favour product-specific EPDs.
  • BREEAM, whose materials life cycle credits rely on building LCAs that use EPD data in place of generic values.
  • National schemes such as FDES on the French INIES database and the Dutch national environmental database.
  • The Construction Products Regulation (EU) 2024/3110, under which GWP becomes a declared characteristic in CE marking once each product family's new harmonised technical specification applies.

What EN 15804+A2 requires

Under A2, every EPD must declare modules A1-A3 (product stage), C1-C4 (end of life) and D (benefits and loads beyond the system boundary). A cradle-to-gate EPD covering only A1-A3 is allowed only if three conditions are all met. The product is physically integrated with other products during installation so it cannot be separated at end of life, it is no longer identifiable at end of life because of a physical or chemical transformation, and it contains no biogenic carbon. Cement, mortar and some coatings can meet these conditions. Steel, glass, tiles, insulation boards and aluminium profiles normally cannot.

The standard requires 13 core impact indicators, including GWP split into total, fossil, biogenic and land use and land use change, plus 6 additional indicators, resource use and waste indicators, and the biogenic carbon content of product and packaging. Cut-off rules allow excluding flows below 1 per cent of mass and energy per unit process, with no more than 5 per cent excluded per module. Company-specific data should be no older than 5 years and generic data no older than 10. A full breakdown of modules is in our article on EN 15804+A2 modules explained.

Product groups and the c-PCRs that apply

Many product groups have a European complementary PCR (c-PCR) that adds rules on top of EN 15804. Programme operators such as the International EPD System publish matching c-PCRs under their construction PCR 2019:14. These are the ones we use most for Turkish manufacturers.

Product groupComplementary rulesData that moves the result most
Cement and building limeEN 16908Clinker ratio, kiln fuel mix including alternative fuels, process CO₂ from calcination
Concrete and precast elementsEN 16757Cement content and type, supplementary materials, aggregate transport
Structural steel and aluminium productsEN 17662Steel route (electric arc furnace or blast furnace), scrap share, electricity source, module D credit
Ceramic tilesEN 17160Natural gas use in spray drying and firing, body composition, glaze
Thermal insulationEN 16783Blowing agents, binder, density, raw material origin
Flat glass and glass productsEN 17074Furnace energy, cullet share, soda ash
Windows and doorsEN 17213Billet origin and recycled content, anodising or powder coating, glazing

For cement, note that EN 16908 is itself being revised under the new CPR standardisation request, which sets 30 June 2027 as the target for the revised standard. We follow the programme operator's transition rules when a c-PCR changes during your project.

Sector points we check in Turkish plants

Each sector has a few modelling choices that verifiers look at closely. In cement plants we reconcile clinker production with the plant's greenhouse gas monitoring report and treat alternative fuels such as tyre-derived fuel or refuse-derived fuel under the PCR rules for waste inputs. In steel, the electric arc furnace route dominates Turkish production, so scrap origin, pre-consumer and post-consumer shares and electricity supply decide the result.

For aluminium profiles, the origin of primary aluminium in purchased billet often outweighs everything that happens in the extrusion plant, so supplier data is worth chasing. In ceramics and glass, natural gas consumption per tonne and the share of recycled content are the main levers. Across all sectors, how you model electricity matters. Turkey's YEK-G renewable energy certificates can be used where the PCR's quality criteria for contractual instruments are met, and the residual mix applies otherwise.

Scenarios for EU construction projects

Modules A4 and A5 and the end-of-life modules depend on where the product is used. For a Turkish product going to a project in Germany or the Netherlands, A4 has to reflect the real route, for example truck to Mersin or Ambarlı, sea freight and onward road transport, not a domestic default. End-of-life scenarios for C1-C4 and D should reflect recycling and landfill rates in the target market. Where buyers in several countries use the EPD, we model a representative scenario and document how other scenarios would change the result, so building LCA practitioners can adjust it.

EN 15804 EPDs, CBAM and the CPR

Cement, iron and steel and aluminium exporters also report under CBAM, and clients often ask whether one figure can serve both. It cannot be copied across. CBAM embedded emissions follow their own monitoring rules, system boundaries and default values, while an EPD's GWP follows EN 15804+A2 and the PCR. The plant data underneath is largely shared, though, so we collect it once and run both calculations from the same source. See our CBAM embedded emissions calculation service for that side.

Under the CPR, the environmental declaration in the declaration of performance and conformity will be checked by a notified body under assessment system 3+, separately from EPD verification. The calculation method is the same EN 15804+A2 approach, so an EPD with well documented plant data is the strongest starting point. As of October 2026, no product family had yet reached the point where the GWP declaration applies under the new CPR, and the first are expected from 2027 onwards as revised standards are delivered.

How a construction product EPD project runs

  1. Scoping (1 to 2 weeks). Product range, plants, c-PCR, modules, programme operator and verifier.
  2. Plant data collection (2 to 6 weeks). Twelve months of production, energy, materials, emissions, waste and logistics data, with a site visit or video walk-through.
  3. LCA modelling and scenarios (2 to 4 weeks). Including A4 and end-of-life scenarios for the target markets.
  4. EPD drafting (1 to 2 weeks). In the operator's template, in English.
  5. Verification (2 to 6 weeks). We answer all findings until the statement is issued.
  6. Publication (1 to 2 weeks). Registration, publication and delivery of the digital data set where available, so building LCA tools can import your figures.

Covering a product range in one EPD

Tile producers, insulation manufacturers and aluminium extruders usually sell dozens or hundreds of variants. Publishing one EPD per variant is rarely sensible. We group products by process and composition, test how far results spread within each group, and then choose between a multi-product EPD with separate result tables, an average EPD, or a representative product with a stated variation. For profiles and tiles, results can often be expressed per kg or per m² with a conversion table, so specifiers can scale them to the exact item they use.

What you receive

  • A verified EN 15804+A2 EPD, registered and published by your chosen programme operator
  • The confidential LCA project report that the verifier reviewed
  • Digital EPD data where the operator provides it, for import into building LCA tools
  • A one-page summary of the main results and the scenarios used, for sales and tender teams
  • A hotspot list showing which inputs drive GWP and how much each lever could change it

The general process, programme operator options and cost drivers are described on our EPD consultancy page. When you need a broader LCA for ecodesign alongside the EPD, see life cycle assessment services.

Questions

EN 15804 EPDs for Construction Products questions

Do EPDs to EN 15804+A1 still count?

Existing A1 EPDs stay valid until their expiry date, but the main European programme operators no longer accept new A1 EPDs and many building LCA tools and tenders now expect A2 data. A1 results also cannot be compared directly with A2 results because the impact methods differ. If your A1 EPD expires within the next year or two, plan the A2 update now.

Which modules must a construction product EPD include?

Under EN 15804+A2, modules A1-A3, C1-C4 and D are mandatory. Only products that meet all three exemption conditions, being physically integrated, no longer identifiable at end of life and free of biogenic carbon, may declare A1-A3 alone. Modules A4, A5 and B1-B7 are optional, though some buyers and c-PCRs expect A4 and A5 for products shipped to EU sites.

Can one EPD cover several plants in Turkey?

Yes, as an average EPD, provided the products and processes are comparable and the programme operator's variation rules are met. The International EPD System, for example, limits the difference in A1-A3 GWP-GHG between the declared average and each included product to 10 per cent, and every site must be named. If plants differ more, separate result tables or separate EPDs are needed.

Will our EPD be accepted for LEED and BREEAM?

A verified, published EN 15804 or ISO 21930 EPD is the document LEED and BREEAM assessors look for. LEED counts product-specific verified EPDs more favourably than industry-average ones, and BREEAM building LCAs can use your EPD data instead of generic values. Acceptance for a specific credit depends on the rating system version used on the project, which the project team confirms.

Can our EPD GWP figure be used for CBAM?

No. CBAM embedded emissions are calculated under the CBAM implementing rules with their own system boundaries, monitoring requirements and treatment of precursors, and an EPD's GWP-total follows EN 15804+A2. The two figures will differ. The plant data behind them overlaps heavily, so we collect it once and run both calculations, with a note explaining the difference for your buyers.

What happens to our EPD when the CPR environmental declaration applies?

The CPR declaration is a separate obligation, made in the declaration of performance and conformity and checked by a notified body under system 3+. It applies to your product family only once its new harmonised technical specification applies, which for most products is expected from 2027 onwards. Because the method is EN 15804+A2 in both cases, a current EPD gives you the data and documentation the notified body will ask for.

Related articles

All articles
EPD and LCA 7 min read

EN 15804+A2 Modules Explained, from A1-A3 to Module D

A module-by-module guide to EN 15804+A2, with the full A1 to D table, which modules are mandatory, the 19 impact indicators and the mistakes that slow down EPD verification.

Read article
EPD and LCA 7 min read

What Is an EPD and What Does It Contain

What an environmental product declaration is, the standards behind it, what it contains, what EPD certification really means, how long it takes and what drives the cost.

Read article

Start a project

Tell us what you need to comply with

Share the regulation, product or site and your deadline. An engineer replies within one working day with what applies and the next steps.